Violation Detail
Standard Cited: 19100217 D09 I Mechanical power presses.
Inspection Nr: 1096256.015
Citation: 03002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,930.00
Current Penalty: $4,504.00
Issuance Date: 03/30/2016
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 04/25/2016
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 04/22/2016
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/22/2016 | $4,504.00 | 04/25/2016 | Serious | |
| Penalty | Z: Issued | 03/30/2016 | $6,930.00 | 04/25/2016 | Serious |
Text For Citation: 03 Item/Group: 002A Hazard:
29 CFR 1910.217(d)(9)(i): The employer did not establish a diesetting procedure that insured compliance with paragraph (c) of this section: a) On or about October 5, 2015, at the above located workplace, a set-up employee was required to perform work under punch press ram and between the upper and lower dies of mechanical punch press 21 (USI/Clearing, 150 ton, part revolution mechanical punch press). The employer had not established a diesetting procedure to address safeguarding the point of operation as specified in paragraph 29 CFR 1910.217(c). b) On or about October 7, 2015, at the above located workplace, a set-up employee was required to perform work under punch press ram and between the upper and lower dies of mechanical punch press 22 (Dreis & Krump, 200 ton, part revolution mechanical punch press). The employer had not established a diesetting procedure to address safeguarding the point of operation as specified in paragraph 29 CFR 1910.217(c). c) On or about October 15, 2015, at the above located workplace, a set-up employee was required to perform work under punch press ram and between the upper and lower dies of mechanical punch press 2 (Niagara, 100 ton, part revolution mechanical punch press). The employer had not established a diesetting procedure to address safeguarding the point of operation as specified in paragraph 29 CFR 1910.217(c).