Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 305618050
Citation: 03002
Citation Type: Serious
Abatement Status: W
Initial Penalty: $1,200.00
Current Penalty: $1,200.00
Issuance Date: 02/18/2003
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 02/22/2003
Gravity:
Report ID: 1055340
Contest Date: 03/03/2003
Final Order: 01/14/2004
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 01/14/2004 | $1,200.00 | 02/22/2003 | Serious | |
| Penalty | Z: Issued | 02/18/2003 | $1,200.00 | 02/22/2003 | Serious |
Translate