Violation Detail
Standard Cited: 19100305 G01 IV C Wiring methods, components, and equipment for general use.
Inspection Nr: 1727911.015
Citation: 03002
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/23/2024
Nr Instances: 1
Nr Exposed: 15
Abatement Date:
Gravity:
Report ID: 0936300
Contest Date:
Final Order: 06/18/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/18/2024 | $0.00 | Other | ||
Penalty | Z: Issued | 05/23/2024 | $0.00 | Other |
Text For Citation: 03 Item/Group: 002 Hazard:
29 CFR 1910.305(g)(1)(iv)(C): Flexible cords and cables were used where run through doorways, windows, or similar openings: On February 20, 2024, pier side paint area, next to temporary blasting booth: An extension cord powering a string of LED lights was pinched at the metal door corner to the Conex container that contained the paints used for ship repair projects. Employees were exposed to electrical and fire hazards.