Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1590242.015
Citation: 03002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,252.00
Current Penalty: $5,034.00
Issuance Date: 09/26/2022
Nr Instances: 2
Nr Exposed: 12
Abatement Date:
Gravity: 5
Report ID: 0213900
Contest Date: 09/13/2022
Final Order: 03/11/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/11/2024 | $5,034.00 | Serious | ||
Penalty | C: Contested | 10/28/2022 | $7,252.00 | Serious | ||
Penalty | Z: Issued | 09/26/2022 | $7,252.00 | Serious |
Text For Citation: 03 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a) Facility: On or about 4/16/2022, a path to a designated exit door in the northeast corner of the building was blocked with pallets of paint, boxes, and steel parts. b) Facility: On or about 04/18/2022, a designated exit on the west side of the building leading into the yard was obstructed by metal barrels of steel shot. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.