Violation Detail
Standard Cited: 19100217 E01 II Mechanical power presses.
Inspection Nr: 1123267.015
Citation: 03002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/15/2016
Nr Instances: 3
Nr Exposed: 7
Abatement Date: 08/03/2016
Gravity:
Report ID: 0418600
Contest Date:
Final Order: 08/04/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/04/2016 | $0.00 | 08/03/2016 | Other | |
| Penalty | Z: Issued | 07/15/2016 | $0.00 | 08/03/2016 | Other |
Text For Citation: 03 Item/Group: 002 Hazard:
29 CFR 1910.217(e)(1)(ii): Mechanical power press(es) were not inspected and tested at least weekly to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism: a) Power Press (PP-02); On or about January 26, 2016 and at time prior thereto, the employer did not inspect and test at least weekly the mechanical full revolution power press to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism. b) Power Press (PP-04); On or about January 26, 2016 and at time prior thereto, the employer did not inspect and test at least weekly the mechanical full revolution power press to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism. c) Power Press (PP-05); On or about January 26, 2016 and at time prior thereto, the employer did not inspect and test at least weekly the mechanical full revolution power press to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism.