Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1091666.015
Citation: 03002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,000.00
Current Penalty: $2,600.00
Issuance Date: 02/17/2016
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 04/04/2016
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 03/14/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/14/2016 | $2,600.00 | 04/04/2016 | Serious | |
Penalty | Z: Issued | 02/17/2016 | $4,000.00 | 04/04/2016 | Serious |
Text For Citation: 03 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Plant: On, or about, December 11, 2015, the employer had not conducted periodic inspections of the energy control procedures. The last revision date on the program was June 23, 2010 and the specific procedures that were reviewed during the inspection had been prepared on February 24, 2012.