Violation Detail
Standard Cited: 19261416 E05 I
Inspection Nr: 1657907.015
Citation: 03001C
Citation Type: Willful
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/15/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/01/2023
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/01/2023 | $0.00 | Willful | ||
| Penalty | Z: Issued | 09/15/2023 | $0.00 | Willful |
Text For Citation: 03 Item/Group: 001C Hazard:
29 CFR 1926.1416(e)(5)(i): The operator did not verify that the position of the outriggers or stabilizers was correct (in accordance with manufacturer procedures) before beginning operations requiring outrigger or stabilizer deployment. Location: 25 Sixth Street, Chelsea, MA; On or about 03/21/2023, the crane operator utilized the Tadano GR800XL (serial number: 547134) crane without verifying the outrigger position, resulting in a tip over.
Translate