Violation Detail
Standard Cited: 19261403 A
Inspection Nr: 1657907.015
Citation: 03001B
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/15/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/18/2023
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/01/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/01/2023 | $0.00 | 12/18/2023 | Willful | |
Penalty | Z: Issued | 09/15/2023 | $0.00 | 12/18/2023 | Willful |
Text For Citation: 03 Item/Group: 001B Hazard:
29 CFR 1926.1403(a): Manufacturer procedures applicable to assembly were not complied with. Location: 25 Sixth Street, Chelsea, MA; On or about 03/21/2023, the 2010 Tadano GR800XL (serial number: 547134) was not assembled to meet the manufacturer procedures and instructions which called for the mandatory attachment of the 17,400lb counterweight prior to operation.