Powered by GoogleTranslate

Violation Detail

Standard Cited: 19261101 K09 VIII H Asbestos

Inspection Nr: 996799.015

Citation: 03001

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/24/2015

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 04/03/2015

Gravity:

Report ID: 0524200

Contest Date:

Final Order: 04/16/2015

Related Event Code (REC):

Emphasis:

Substance: 9020


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 04/16/2015 $0.00 04/03/2015 Other  
Penalty Z: Issued 03/24/2015 $0.00 04/03/2015 Other  

Text For Citation: 03 Item/Group: 001 Hazard:

29 CFR 1926.1101(k)(9)(viii)(H): The employer did not ensure that each employee was informed of the contents of 29 CFR 1926.1101 and its appendices: a) A.M. Castle & Co., Franklin Park, IL, did not ensure that each maintenance employee performing work covered under this standard was informed of the contents of the regulation and its appendices. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.