Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 891724.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/23/2013
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 09/07/2013
Gravity:
Report ID: 0317900
Contest Date:
Final Order: 09/10/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/10/2013 | $0.00 | 09/07/2013 | Other | |
| Penalty | Z: Issued | 08/23/2013 | $0.00 | 09/07/2013 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employees were not instructed in the purpose and use of the energy control procedure: a) Production floor, Rock Run processing facility - On or about February 27, 2013 Affected employees working near and operating processing equipment had not been trained in the purpose and use of the energy control procedure.