Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 317612216
Citation: 03001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $3,150.00
Current Penalty: $3,150.00
Issuance Date: 12/29/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/01/2014
Gravity:
Report ID: 1055340
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate