Violation Detail
Standard Cited: 19100022 B General requirements.
Inspection Nr: 1798908.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/09/2025
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 09/30/2025
Gravity:
Report ID: 0316400
Contest Date:
Final Order: 07/03/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/03/2025 | $0.00 | 09/30/2025 | Other | |
Penalty | Z: Issued | 06/09/2025 | $0.00 | 06/20/2025 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.22(b): The employer did not ensure that each walking-working surface can support the maximum intended load for that surface. (a) Production Line 3000: On or about January 16, 2025, the employer did not ensure the elevated platform (mezzanine) located above Production Line 3000 was clearly marked or otherwise documented with its maximum intended load capacity. (b) Production Line 4000: On or about January 16, 2025, the employer did not ensure the elevated platform (mezzanine) located above Production Line 4000 was clearly marked or otherwise documented with its maximum intended load capacity. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.