Violation Detail
Standard Cited: 19030019 C01 Abatement verification.
Inspection Nr: 1770491.015
Citation: 03001
Citation Type: Other
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $438.00
Current Penalty: $438.00
Issuance Date: 04/11/2025
Nr Instances: 5
Nr Exposed: 4
Abatement Date: 04/30/2025
Gravity:
Report ID: 0523400
Contest Date:
Final Order: 08/01/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/11/2025 | $438.00 | 04/30/2025 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1903.19(c)(1):The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: (a) Jose N Alvarado Services LLC, failed to certify abatement within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation 1, Item 1 a Serious violation of OSH ACT of 1970 Section (5)(a)(1) with an abatement date of January 30, 2025. Citation 1, Item 3 a serious violation of 1926.300(b)(2)) with an abatement date of February 12, 2025. Citation 1, Item 4 a serious violation of 1926.503(a)(1)with an abatement date of February 12, 2025. Citation 1, Item 3 a repeat violation of 1926.20(b)(2) with an abatement date of February 12, 2025. Citation 1, Item 3 a repeat violation of 1926.501(b)(13) with an abatement date of February 12, 2025. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATIONS OF THE CORRECTIVE ACTION WORKSHEET).