Violation Detail
Standard Cited: 19100038 C03 Emergency action plans.
Inspection Nr: 1729908.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/19/2024
Nr Instances: 1
Nr Exposed: 1384
Abatement Date: 10/04/2024
Gravity:
Report ID: 0134000
Contest Date: 09/10/2024
Final Order: 09/18/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/18/2024 | $0.00 | 10/04/2024 | Other | |
| Penalty | C: Contested | 09/11/2024 | $0.00 | 10/04/2024 | Other | |
| Penalty | Z: Issued | 08/19/2024 | $0.00 | 10/04/2024 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.38(c)(3) - The emergency action plan did not include the procedures to be followed by employees who remain to operate critical plant operations before they evacuate: Location - Throughout Facility On or about 02/20/24, the Emergency Action Plan did not include procedures for employees performing critical plant operations to follow in the event of an emergency.