Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1641975.015
Citation: 03001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $8,000.00
Issuance Date: 05/04/2023
Nr Instances: 2
Nr Exposed: 2
Abatement Date:
Gravity:
Report ID: 0420100
Contest Date: 05/25/2023
Final Order: 05/02/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 05/02/2024 | $8,000.00 | Serious | ||
Penalty | C: Contested | 07/03/2023 | $0.00 | Other | ||
Penalty | Z: Issued | 05/04/2023 | $0.00 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used where run through holes in walls, ceilings, or floors; a) On or about 1-5-2023, the portable mail cabinet employees use in the Harned Post Office had an energized flexible extension cord powering the lighting that ran form a hole cut into the ceiling to the lighting creating an electrical/fire hazard.