Violation Detail
Standard Cited: 19260859 G Mechanical demolition.
Inspection Nr: 1505772.015
Citation: 03001
Citation Type: Serious
Abatement Date: 12/29/2023 2
Initial Penalty: $136,532.00
Current Penalty: $15,625.00
Issuance Date: 05/13/2021
Nr Instances: 1
Nr Exposed: 24
Related Event Code (REC): A
Gravity: 10
Report ID: 0522000
Contest Date: 02/02/2021
Final Order: 08/31/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/31/2023 | $15,625.00 | 12/29/2023 | Serious | |
Penalty | C: Contested | 05/02/2022 | $136,532.00 | 06/30/2021 | Willful | |
Penalty | Z: Issued | 05/13/2021 | $136,532.00 | 06/30/2021 | Willful |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1926.859(g): During demolition, continuing inspections by a competent person shall be made as the work progresses to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. No employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing, or other effective means. AVD: The Employer did not ensure that the continuing inspections made by the competent person as the work progressed to detect potential hazards as the structure was being prepared for explosive demolition by the explosive basting contractor were fully documented and penalty changed to $15,625.