Violation Detail
Standard Cited: 19260652 C03 III Requirements for protective systems.
This violation item has been deleted.
Inspection Nr: 1469193.015
Citation: 03001
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/01/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/13/2020
Gravity:
Report ID: 0522500
Contest Date: 05/12/2020
Final Order: 04/26/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/26/2021 | $0.00 | 05/13/2020 | Other | |
Penalty | C: Contested | 05/18/2020 | $0.00 | 05/13/2020 | Other | |
Penalty | Z: Issued | 05/01/2020 | $0.00 | 05/13/2020 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1926.652(c)(3)(iii): At least one copy of the tabulated data, which identifies the registered professional engineer who approved the data, shall be maintained at the jobsite during construction of the protective system. After that time the data may be stored off the jobsite, but a copy of the data shall be made available to the Secretary upon request. a. On or about March 12, 2020, located at The Courtyards At River Bluff at 6652 South Section Line Delaware, Ohio, an employee was performing pipe work in an excavated trench that had a trench shield. The employer did not maintain tabulated data at the jobsite for the protective system while being constructed nor did the employer make available a copy of the data to the Secretary upon request.