Violation Detail
Standard Cited: 19030019 C01 Abatement verification.
Inspection Nr: 1412217.015
Citation: 03001
Citation Type: Other
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $319.00
Current Penalty: $319.00
Issuance Date: 11/20/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/05/2019
Gravity:
Report ID: 0111500
Contest Date:
Final Order: 12/30/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 11/20/2019 | $319.00 | 12/05/2019 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1903.19(c)(1): Employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Location: Building 21, Woodiands at Rivington, Danbury, CT 06810 Abatement certification and verification for Citation 001, Item 01; Citation 001, Item 02 and Citation 02, Item 01 with a final order date of October 30, 2019 was not received within 10 calendar days (by October 21, 2019) following the abatement due date (October 11, 2019).