Violation Detail
Standard Cited: 19260416 E02 General requirements.
Inspection Nr: 1398062.015
Citation: 03001
Citation Type: Other
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/24/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/30/2019
Gravity:
Report ID: 0524200
Contest Date:
Final Order: 11/19/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2019 | $0.00 | 10/30/2019 | Other | |
Penalty | Z: Issued | 10/24/2019 | $0.00 | 10/30/2019 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1926.416(e)(2): Extension cords were fastened with staples, hung from nails, or suspended by wire: a) On May 3, 2019, employees were using an extension cord which was hung by a nail. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).