Violation Detail
Standard Cited: 19030019 C01 Abatement verification.
Inspection Nr: 1250969.015
Citation: 03001
Citation Type: Other
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $406.00
Current Penalty: $406.00
Issuance Date: 11/29/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/03/2018
Gravity:
Report ID: 0524200
Contest Date:
Final Order: 01/03/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 11/29/2017 | $406.00 | 01/03/2018 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Rene Construction Corp., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 10/10/2017 01 02 11/02/2017 02 01 10/10/2017 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).