Violation Detail
Standard Cited: 19260502 B09 Fall protection systems criteria and practices.
Inspection Nr: 1246060.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/22/2017
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 11/14/2017
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 10/24/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2017 | $0.00 | 11/14/2017 | Other | |
Penalty | Z: Issued | 09/22/2017 | $0.00 | 10/04/2017 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1926.502(b)(9): Wire rope used as top rails was not flagged at 6-foot (1.8 m) intervals or less with high-visibility materials: a) On or about 7/11/2017, Nicholas Ferrante Building, OCC Drive: Employees performing roofing work on the lower roof were utilizing a guardrail system which had a top rail of wire rope. There was no flagging in use on the top rail. Abatement certification is required for this item.