Violation Detail
Standard Cited: 19260503 B01 Training requirements.
Inspection Nr: 1205591.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/20/2017
Nr Instances: 2
Nr Exposed: 7
Abatement Date: 09/06/2017
Gravity:
Report ID: 0316700
Contest Date: 08/07/2017
Final Order: 06/22/2018
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/22/2018 | $0.00 | 09/06/2017 | Other | |
Penalty | C: Contested | 08/09/2017 | $0.00 | 09/06/2017 | Other | |
Penalty | Z: Issued | 07/20/2017 | $0.00 | 09/06/2017 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. a) 305 South Richland Ave - The employer did not certify that the five (5) Ream Roofing employees working on the roof were trained to recognize fall hazards on or about January 26, 2017. b) 305 South Richland Ave - The employer did not certify that the two (2) employees borrowed from NRC roofing were trained to recognize fall hazards on or about January 26, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.