Violation Detail
Standard Cited: 19100269 D02 II C Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1102415.015
Citation: 03001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/26/2016
Nr Instances: 5
Nr Exposed: 6
Abatement Date: 06/13/2016
Gravity:
Report ID: 0418200
Contest Date: 05/16/2016
Final Order: 03/31/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/31/2017 | $0.00 | 06/13/2016 | Other | |
Penalty | C: Contested | 05/20/2016 | $0.00 | 06/13/2016 | Other | |
Penalty | Z: Issued | 04/26/2016 | $0.00 | 06/13/2016 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.269(d)(2)(ii)(C): After November 1, 1994, whenever replacement or major repair, renovation, or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machines or equipment shall be designed to accept a lockout device. a. Plant Bowen, JBR 3/4 Building Bus B - The employer used tagout to identify energy source isolation at the point where a lockout device should have been used to control potentially hazardous energy points on electrical equipment manufactured and installed in 2005-2006 that was not capable of being locked out.