Violation Detail
Standard Cited: 19100119 D03 I F Process safety management of highly hazardous chemicals.
Inspection Nr: 1087765.015
Citation: 03001
Citation Type: Other
Abatement Date: 03/30/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/22/2016
Nr Instances: 7
Nr Exposed: 52
Related Event Code (REC):
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 03/14/2016
Emphasis:
Substance: 1290
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/14/2016 | $0.00 | 03/30/2016 | Other | |
Penalty | Z: Issued | 02/22/2016 | $0.00 | 03/30/2016 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(F): The employer did not include the process safety information of the design codes and standards which were employed. On or about 08/27/2015, the employer did not include all the process safety information of design codes and standards when: a) API 2000 was employed by the company to design and maintain the emergency pressure relief systems. b) FM Global standard and equations were employed by the company to size rupture discs. c) Foxboro, Beckman and Asco safety instrumentation systems and emergency shutdown systems were employed by the company to read and regulate equipment temperatures and pressures. d) FM Global standard was employed by the company to design and maintain the fire detection and suppression systems. e) NFPA 12A standard was employed by the company to design and maintain the halon fire suppression system. f) Wisconsin SPS 310 standard was employed by the company to design the dike system. g) Uninterruptable Power Supply (UPS) standard was employed by the company to size, design and maintain the DCS control systems.