Violation Detail
Standard Cited: 19100119 J04 III Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02042
Citation Type: Willful
Abatement Status:
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 4
Nr Exposed: 25
Abatement Date: 04/19/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 042 Hazard: REFINERY
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process eq uipment to maintain its mechanical integrity, is not consistent with applicable manufacturers' recommendations and good engineering practices, or more frequentl y determined to be necessary by prior operating experience: a. BP-Husky Refining , LLC - Oregon, Ohio: Thickness measurements at TML 0260, 0310, 0350, 0360, 0410 , 0470, 0475, 0620, 0700, and 0740 on piping circuit 00840 in the Alky 1 unit ar e not taken at intervals that do not exceed the lesser of one half the remaining life determined from the corrosion rate or the specified maximum interval of 5 years for a Class 1 circuit. b. BP-Husky Refining, LLC - Oregon, Ohio: Thickness measurements at T ML 0140, 0150, 0160, 0270, 0350, 0470, 0490, 0500, 0560, and 0580 on piping circ uit 00160 in the FCC unit are not taken at intervals that do not exceed the less er of one half the remaining life determined from the corrosion rate or the spec ified maximum interval of 10 years for a Class 2 circuit. c. BP-Husky Refining, LLC - Oregon, Ohio: Tthickness measurements at TML 0010, 0090, 0120, 0300, and 0 320 on piping circuit 01040 in the Cat Poly unit are not taken at intervals that do not exceed the lesser of one half the remaining life determined from the cor rosion rate or the specified maximum interval of 5 years for a Class 1 circuit. d. BP-Husky Refining, LLC - Oregon, Ohio: Thickness measurements at TML 0010SD, 0020SD, and 0030SD on piping circuit 00430 in the Reformer 1 unit are not taken at intervals that do not exceed the lesser of one half the remaining life determ ined from the corrosion rate or the specified maximum interval of 5 years for a Class 1 circuit. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of th e abatement date, the empoyer must submit documentation that it has abated the h azard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatmen t plan describing the actions it is taking to ensure that it is in compliance wi th the standards for process equipment testing frequencies in accordance with recognized and generally accepted good engineering practices, such as API 570. The abatement plan shall establish dates during the next three months that indicate when the intervals for thickness measurements will be impl emented in accordance with RAGAGEP. Once the plan has been fully implemented, th e employer must submit certification of its full compliance with the standard.