Violation Detail
Standard Cited: 19100303 B07 I General.
Inspection Nr: 1542164.015
Citation: 02031B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/06/2022
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 02/24/2022
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 02/11/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/11/2022 | $0.00 | 02/24/2022 | Serious | |
Penalty | Z: Issued | 01/06/2022 | $0.00 | 02/24/2022 | Serious |
Text For Citation: 02 Item/Group: 031B Hazard:
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment: A. Plastics Finishing: On, or about, August 27, 2021, a gap was left between the cover and the overcurrent devices in the large General Electric panelboard that energized presses in the work area. B. Main Electrical Room: On, or about, August 27, 2021, cardboard was used to cover a gap between overcurrent devices and a blank panel on a General Electric switchboard enclosure.