Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02026A
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 026A Hazard: REFINERY
29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document the need for over pressure protection on pressure vessels as required by recogni zed and generally accepted good engineering practices. The Steam Slurry Generato r (PR543565) is not protected by pressure relieving devices that would prevent t he pressure inside the vessel from rising above acceptable limits. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation tha t it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer m ust submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards for all pressure vessels, including docum enting that each pressure vessel has been evaluated and is protected by pressure -relieving device(s) in accordance with recognized and generally accepted good e ngineering practices, such as the ASME Boiler and Pressure Vessel Code. The abat ement plan shall establish dates during the next three months when the evaluatio ns and installations of overpressure protection shall be completed. Once the pla n has been fully implemented, the employer must submit certification of its full compliance with the standard.