Violation Detail

Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.

Inspection Nr: 1407005.015

Citation: 02019A

Citation Type: Other

Abatement Status: Corrected During Inspection

Initial Penalty: $5,834.00

Current Penalty: $0.00

Issuance Date: 10/31/2019

Nr Instances: 2

Nr Exposed: 5

Abatement Date:

Gravity:

Report ID: 0112000

Contest Date: 11/27/2019

Final Order: 03/27/2020

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 03/27/2020 $0.00   Other  
Penalty F: Formal Settlement 03/27/2020 $0.00   Other  
Penalty C: Contested 12/05/2019 $5,834.00   Serious  
Penalty Z: Issued 10/31/2019 $5,834.00   Serious  

Text For Citation: 02 Item/Group: 019A Hazard:

29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions: A. Block Plant, Main Floor: On, or about, June 18, 2019, liquid tight conduit that connected the MGM transformer to the rear of the splitter/turnover control enclosure was pulled from the enclosure, exposing the inner conductors. B. Block Plant, Main Floor, Pattern Maker: On, or about, June 18, 2019, liquid tight conduit provided for line shaft power was pulled from the side of an electrical box.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.