Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02017A
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 017A Hazard: REFINERY
29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document compliance with recognized and generally accepted good engineering practices by ensuring PSV- 1281, a conventional relief valve, has a back pressure of less tha n or equal to 10of its set pressure. This relief device provides inadequate prot ection to the FCC Feed Drum, and relieves hydrocarbons to the flare. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employ er must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the ac tions it is taking to ensure that it is in compliance with the standards includi ng documentation that each pressure relief valve and associated piping for all p rocess units have been evaluated and, if necessary, repaired or replaced to ensu re backpressure is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520/521 and the ASM E Boiler and Pressure Vessel Code. The abatement plan shall establish dates duri ng the next three months when the evaluations, repairs, and replacements shall b e completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.