Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02013B
Citation Type: Willful
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 04/19/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $0.00 | Willful |
Text For Citation: 02 Item/Group: 013B Hazard: REFINERY
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refinin g, LLC - Oregon, Ohio: The employer does not ensure PSV-115, located in the Alky Unit, is properly designed. PSV-115 provides protection to the Recycle Isobutane Coalescer by relieving hydrocarbons to the flare and was deter mined to be undersized and does not have an adequate relieving rate during relie f scenarios. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the ab atement date, the employer must submit documentation that it has abated the haza rd. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving devi ce(s) that is appropriate for the vessel in accordance with recognized and gener ally accepted good engineering practices, such as the ASME Boiler and Pressure V essel Code. The abatement plan shall establish dates during the next three month s when the evaluations and installation of adequate overpressure protection shal l be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.