Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1542164.015
Citation: 02012
Citation Type: Serious
Abatement Date: 12/30/2022 2
Initial Penalty: $6,827.00
Current Penalty: $4,000.00
Issuance Date: 01/06/2022
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 02/11/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 09/27/2022 | $4,000.00 | 12/30/2022 | Serious | |
Penalty | P: Petition to Mod Abatement | 04/07/2022 | $4,000.00 | 12/30/2022 | Serious | |
Penalty | I: Informal Settlement | 02/11/2022 | $4,000.00 | 02/24/2022 | Serious | |
Penalty | Z: Issued | 01/06/2022 | $6,827.00 | 02/24/2022 | Serious |
Text For Citation: 02 Item/Group: 012 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Plant: On, or about, October 6, 2021, machine specific lockout procedures that had been developed for machinery and equipment located in the metal compacting area had not been subject to a periodic review since they were developed in 1997. Machine specific procedures developed for machinery and equipment located in the machining and furnaces area had not been subject to a periodic review since they were developed in 2000.