Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02009A
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 009A Hazard: REFINERY
29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document that PSV-1280 providing pressure relief protection to the FCC Feed Drum in the F CC Unit complies with recognized and generally accepted good engineering practic es, in that, it has an inlet pressure drop greater than 3 PSV-1280 was determine d to have an inlet pressure drop of 7.7 Pursuant to 29 CFR 1903.19, within ten ( 10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employe r shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards including documenta tion that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pre ssure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the ne xt three months when the evaluations, repairs, and replacements shall be complet ed. Once the plan has been fully implemented, the employer must submit certifica tion of its full compliance with the standard.e