Violation Detail
Standard Cited: 19101025 D01 II Lead.
Inspection Nr: 1604485.015
Citation: 02009A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $10,151.40
Issuance Date: 12/08/2022
Nr Instances: 5
Nr Exposed: 7
Abatement Date: 05/04/2023
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 01/05/2023
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2023 | $10,151.40 | 05/04/2023 | Serious | |
Penalty | Z: Issued | 12/08/2022 | $14,502.00 | 01/27/2023 | Serious |
Text For Citation: 02 Item/Group: 009A Hazard:
29 CFR 1910.1025(d)(1)(ii): Full shift (for at least seven -7 continuous hours) personal samples for lead were not collected including at least one sample for each shift for each job classification in each work area: In the bead wire department, where employees cleaned the lead pot the employer did not monitor employees on at least three production shifts to establish exposure levels. On August 19, 2022, in the bead wire department, employees personal air monitoring of the employees cleaning the lead pot revealed the following results: Employee; Time; actual ug/m3 exposure; 8-hr Time-weighted exposure; Comparison to 50 ug/m3 PEL a) Operator; 270 min; 2,817 ug/M3 actual; 1,584.8 ug/M3 8-hr TWA; 31.7 times the PEL b) Bead Wire Lead; 285 min; 1,791 ug/M3 actual; 1,063.6 ug/M3 8-hr TWA; 21.3 times the PEL c) Operator; 420 min; 1,339.7ug/M3 actual; 1,172.2 ug/M3 8-hr TWA; 23.4 times the PEL d) Operator; 397 min; 73.85 ug/M3 actual; 61.1 ug/M3 8-hr TWA; 1.2 times the PEL e) Operator; 255 min; 2,200 ug/M3 actual; 1,168.8 ug/M3 8-hr TWA; 3.4 times the PEL