Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1421282.015
Citation: 02009A
Citation Type: Other
Abatement Date: 08/26/2022 2
Initial Penalty: $10,409.00
Current Penalty: $5,204.50
Issuance Date: 02/04/2020
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0627100
Contest Date: 02/24/2020
Final Order: 10/19/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/19/2022 | $5,204.50 | 08/26/2022 | Other | |
Penalty | C: Contested | 03/04/2020 | $10,409.00 | 02/18/2020 | Serious | |
Penalty | Z: Issued | 02/04/2020 | $10,409.00 | 02/18/2020 | Serious |
Text For Citation: 02 Item/Group: 009A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: On or about August 5, 2019 and times prior, the employer used flexible cords in the place of fixed wiring in the following areas: - a. On the east wall, west wall, and floor of Fab 1 shop where extension cords were used for more than 90 days to power Americraft industrial fans and fluorescent light fixtures. b. On the east wall, west wall, and shop floor of Fab 2 where extension cords were used for more than 90 days to power industrial fans on the floor and the wall exhaust fans.