Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 314601642
Citation: 02008
Citation Type: Other
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 02/22/2011
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/11/2011
Gravity: 01
Report ID: 0418600
Contest Date: 03/16/2011
Final Order: 03/09/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/09/2012 | 03/11/2011 | Other | ||
| Penalty | Z: Issued | 02/22/2011 | 03/11/2011 | Other |
Text For Citation: 02 Item/Group: 008 Hazard: CHEMNEP
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a)Millard facility: On or about August 23, 2010 and at times prior the employer exposed employees to unexpected start-up of compressors in that the periodic inspections had not been completed for energy control procedures.