Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).

Inspection Nr: 314601642

Citation: 02008

Citation Type: Other

Abatement Status: X

Initial Penalty:

Current Penalty:

Issuance Date: 02/22/2011

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 03/11/2011

Gravity: 01

Report ID: 0418600

Contest Date: 03/16/2011

Final Order: 03/09/2012

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty J: ALJ Decision 03/09/2012 03/11/2011 Other  
Penalty Z: Issued 02/22/2011 03/11/2011 Other  

Text For Citation: 02 Item/Group: 008 Hazard: CHEMNEP

29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a)Millard facility: On or about August 23, 2010 and at times prior the employer exposed employees to unexpected start-up of compressors in that the periodic inspections had not been completed for energy control procedures.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.