Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 313891954
Citation: 02008
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $8,400.00
Current Penalty: $4,200.00
Issuance Date: 01/15/2010
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 06/06/2011
Gravity: 10
Report ID: 0751910
Contest Date: 02/09/2010
Final Order: 12/29/2010
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 04/28/2011 | $4,200.00 | 06/06/2011 | Repeat | |
| Penalty | F: Formal Settlement | 12/29/2010 | $4,200.00 | 01/29/2011 | Repeat | |
| Penalty | Z: Issued | 01/15/2010 | $8,400.00 | 03/05/2010 | Repeat |
Translate