Powered by GoogleTranslate

Violation Detail

Standard Cited: 5A0001 OSH Act General Duty Paragraph

Inspection Nr: 18018440

Citation: 02007A

Citation Type: Willful

Abatement Status: X

Initial Penalty: $70,000.00

Current Penalty:

Issuance Date: 08/18/1997

Nr Instances: 10

Nr Exposed: 9

Abatement Date: 09/01/1998

Gravity: 10

Report ID: 0522500

Contest Date: 09/05/1997

Final Order: 09/29/1998

Related Event Code (REC):

Emphasis: X


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 09/29/1998 09/01/1998 Willful  
Penalty Z: Issued 08/18/1997 $70,000.00 09/20/1997 Willful  

Text For Citation: 02 Item/Group: 007A Hazard: ELECTRIC

Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employmnent and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a. Living room - There were three outlets which had no path to ground. b.Dining room - There were two outlets which had no path to ground, one of which was pulled out from the wall exposing live wires and parts. c.Kitchen - There were three outlets which had no path to ground and an ungrounded light above the sink. d.Basement - There was a knockout missing from the fuse box. e.Northwest 2nd floor bedroom - There was an outlet on the west wall which had no path to ground. f.Northwest 2nd floor bedroom - There was an outlet on the south wall which was pulled out of the wall exposing live parts and wires. g.Northeast 2nd floor bedroom - There was an outlet on the north wall which had no path to ground. h.Southwest 2nd floor bedroom - There was an outlet on the west wall which had no path to ground. i.Attic - There were two live outlets with no covers. j. Bathroom - There was no cover on the light over the sink and the outlet had no path to ground. Among other methods, one feasible means of abatement would be to provide electrical installations which are in compliance with the National Electrical Code. Abatement certification and documentation are required.tion

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close