Violation Detail
Standard Cited: 19101025 I05 Lead.
Inspection Nr: 1604485.015
Citation: 02006C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/08/2022
Nr Instances: 5
Nr Exposed: 7
Abatement Date: 01/27/2023
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 01/05/2023
Related Event Code (REC):
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2023 | $0.00 | 01/27/2023 | Serious | |
Penalty | Z: Issued | 12/08/2022 | $0.00 | 01/27/2023 | Serious |
Text For Citation: 02 Item/Group: 006C Hazard:
29 CFR 1910.1025(i)(5): An adequate number of lavatory facilities which comply with 29 CFR 1910.141(d)(1) and(d)(2) were not provided for employee(s) exposed to lead: On or about August 19, 2022, employees who had cleaned the lead pot removed their contaminated protective suits, gloves and respirators in the adjacent boiler room that was not provided with hot water. Personal air monitoring of the employees cleaning the lead pot on August 19, 2022 revealed the following results: Employee; Time; actual ug/m3 exposure; 8-hr Time-weighted exposure; Comparison to 50 ug/m3 PEL a) Operator; 270 min; 2,817 ug/M3 actual; 1,584.8 ug/M3 8-hr TWA; 31.7 times the PEL b) Bead Wire Lead; 285 min; 1,791 ug/M3 actual; 1,063.6 ug/M3 8-hr TWA; 21.3 times the PEL c) Operator; 420 min; 1,339.7ug/M3 actual; 1,172.2 ug/M3 8-hr TWA; 23.4 times the PEL d) Operator; 397 min; 73.85 ug/M3 actual; 61.1 ug/M3 8-hr TWA; 1.2 times the PEL e) Operator; 255 min; 2,200 ug/M3 actual; 1,168.8 ug/M3 8-hr TWA; 3.4 times the PEL f) Operator; 240 min; 57 ug/M3 actual; 28.5 ug/M3 8-hr TWA; 57% of the PEL g) Operator; 253 min; 46 ug/M3 actual; 24.2 ug/M3 8-hr TWA; 48.5% of the PEL