Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1670296.015
Citation: 02006B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,687.00
Current Penalty: $0.00
Issuance Date: 11/13/2023
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 09/20/2024
Gravity: 1
Report ID: 0627500
Contest Date: 12/05/2023
Final Order: 06/20/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/20/2024 | $0.00 | 09/20/2024 | Other | |
Penalty | C: Contested | 12/18/2023 | $4,687.00 | 12/08/2023 | Serious | |
Penalty | Z: Issued | 11/13/2023 | $4,687.00 | 12/08/2023 | Serious |
Text For Citation: 02 Item/Group: 006B Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: On or about May 15, 2023, employees were exposed to electrical shock hazards due to electrical equipment not being used or installed in accordance with instructions included in listing or labeling in the following instances: a) In Department #3 Press Area, a lightweight brown 3-outlet extension cord connected to another 3-outlet white extension cord was daisy-chained and being used to supply power to a Microwave 1050W (8.75 A). b) In Department #7 Screw Machine Building, Relocatable Power Tab (RPT) permanently attached to wall supplying power to phone charger.