Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 1670296.015
Citation: 02006A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,687.00
Current Penalty: $6,563.00
Issuance Date: 11/13/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/20/2024
Gravity: 1
Report ID: 0627500
Contest Date: 12/05/2023
Final Order: 06/20/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/20/2024 | $6,563.00 | 09/20/2024 | Other | |
Penalty | C: Contested | 12/18/2023 | $4,687.00 | 12/08/2023 | Serious | |
Penalty | Z: Issued | 11/13/2023 | $4,687.00 | 12/08/2023 | Serious |
Text For Citation: 02 Item/Group: 006A Hazard:
29 CFR 1910.303(b)(7)(iv): There existed damaged parts that could have adversely affected the safe operation or mechanical strength of electrical equipment, such as parts that are broken or bent: On or about May 15, 2023, in Department #7 (Screw Machine Building), the Bowden Liquid Turbocharger Parts Washing System Control Box panel was missing the emergency stop button leaving an open hole on the control box which could potentially cause corrosion, reduce the insulation capability of wires and lead to short-circuits exposing employees to electrical shock and fire hazards.