Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 101154227
Citation: 02006
Citation Type: Willful
Abatement Status: X
Initial Penalty: $10,000.00
Current Penalty: $10,000.00
Issuance Date: 01/31/1991
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 02/03/1991
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate