Violation Detail
Standard Cited: 19261101 G03 III Asbestos
Inspection Nr: 1043352.015
Citation: 02005A
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $70,000.00
Current Penalty: $16,601.57
Issuance Date: 08/10/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/14/2015
Gravity: 10
Report ID: 0524530
Contest Date: 08/27/2015
Final Order: 01/07/2019
Related Event Code (REC): C
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/07/2019 | $16,601.57 | 08/14/2015 | Willful | |
Penalty | C: Contested | 09/01/2015 | $70,000.00 | 08/14/2015 | Willful | |
Penalty | Z: Issued | 08/10/2015 | $70,000.00 | 08/14/2015 | Willful |
Text For Citation: 02 Item/Group: 005A Hazard:
29 CFR 1926.1101(g)(3)(iii): Dust and debris containing asbestos containing material and presumed asbestos containing material were dry swept, shoveled or removed by other dry clean-up methods: The employer does not ensure that dust and debris containing asbestos containing material was not cleaned-up using dry methods. This most recently occurred on or about February 12, 2015 through March 3, 2015. Dust and debris containing asbestos containing material were shoveled and removed by a push broom, rags, shop vac and leaf blower during and after Class I and Class II asbestos work.