Violation Detail
Standard Cited: 19100119 L04 Process safety management of highly hazardous chemicals.
Inspection Nr: 312487457
Citation: 02005
Citation Type: Serious
Abatement Status: W
Initial Penalty: $25,000.00
Current Penalty: $7,000.00
Issuance Date: 07/08/2009
Nr Instances: 2
Nr Exposed: 17
Abatement Date: 08/10/2009
Gravity: 10
Report ID: 0317000
Contest Date: 07/28/2009
Final Order: 01/17/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2012 | $7,000.00 | 08/10/2009 | Serious | |
Penalty | Z: Issued | 07/08/2009 | $25,000.00 | 08/10/2009 | Serious |
Text For Citation: 02 Item/Group: 005 Hazard: REFINERY
29 CFR 1910.119(l)(4): A change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and the process information was not updated: a) Sunoco Marcus Hook Refinery - The employer conducted Management of Change (MOC) Number 10-420040323-2, for the installation of a 2,000 gallon anhydrous ammonia storage tank and associated piping, and the P&ID was not updated to reflect the change, on or about 01/09/2009. b) Sunoco Marcus Hook Refinery - The employer conducted Management of Change (MOC) Number 10-420040629-1, for the installation of an additional injection quill on the ammonia injection system, and the P&ID was not updated to reflect the change, on or about 01/09/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED Sunoco, Inc. was previously cited for a violation of this Occupational Safety and Health Standard or its equivalent standard, which was contained in OSHA Inspection: #312716386, Citation #1, Item #1B and affirmed as a final order on 1/21/2008, with respect to a workplace located at the Philadelphia plant.