Violation Detail
Standard Cited: 19100146 D05 I Permit-required confined spaces
Inspection Nr: 1405010.015
Citation: 02004B
Citation Type: Willful
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/25/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/15/2021
Gravity: 10
Report ID: 0317700
Contest Date: 12/13/2019
Final Order: 08/16/2021
Related Event Code (REC): A
Emphasis:
Substance: 0420
Substance: 1371
Substance: 1380
Substance: 1990
Substance: 2150
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/16/2021 | $0.00 | 10/15/2021 | Willful | |
Penalty | C: Contested | 12/16/2019 | $0.00 | 12/16/2019 | Willful | |
Penalty | Z: Issued | 11/25/2019 | $0.00 | 12/16/2019 | Willful |
Text For Citation: 02 Item/Group: 004B Hazard:
29 CFR 1910.146(d)(5)(i): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not evaluate permit space conditions when entry operations were conducted by testing conditions in the permit space to determine if acceptable conditions existed before entry was authorized to begin: a) Coxton Yard, employees entered tank railcars which were permit required confined spaces that contained IDLH atmospheres, and air monitoring of the interior was not performed prior to entry, on or about May 27 to May 31, 2019. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED