Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02004A
Citation Type: Willful
Abatement Status:
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 04/19/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 004A Hazard: REFINERY
29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document that PSV-447 providing pressure relief protection to the Depropanizer Feed Treat er Drum in the Alky Unit complies with recognized and generally accepted good en gineering practices, in that, it has an inlet pressure drop greater than 3 PSV-4 47 was determined to have an inlet pressure drop of 5.4 Pursuant to 29 CFR 1903. 19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In additio n, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describi ng the actions it is taking to ensure that it is in compliance with the standard s including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replace d to ensure inlet pressure drop is limited in accordance with recognized and gen erally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establis h dates during the next three months when the evaluations, repairs, and replacem ents shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.e