Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.

Inspection Nr: 316029693

Citation: 02004

Citation Type: Repeat

Abatement Status: X

Initial Penalty: $38,500.00

Current Penalty: $23,440.00

Issuance Date: 04/18/2012

Nr Instances: 3

Nr Exposed: 185

Abatement Date: 05/21/2012

Gravity: 10

Report ID: 0213600

Contest Date: 05/03/2012

Final Order: 10/26/2012

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty J: ALJ Decision 10/26/2012 $23,440.00 05/21/2012 Repeat  
Penalty Z: Issued 04/18/2012 $38,500.00 05/21/2012 Repeat  

Text For Citation: 02 Item/Group: 004 Hazard: CHEMNEP

The employer does not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: 29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: UPSTATE NIAGARA COOPERATIVE, INC. WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD, WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 312535800, CITATION NO.1, ITEM NO.7a, AND WAS AFFIRMED AS A FINAL ORDER ON 02/13/09, WITH RESPECT TO A WORKPLACE LOCATED AT 1730 DALE ROAD CHEEKTOWAGA, NY, 14225. A recent example of this occurred on 10/25/11, when: a) In the establishment, Employer did not establish and implement a written procedure for installing and changing flange valves such as, but not limited to: Parker Inlet Pressure Regulator Type A4A that included torque specifications for the bolts. b) In the establishment, Employer did not establish and implement a written procedure for what steps to follow once a Pressure Relief Valve (PRV) is lifted during service. c) In the establishment, Employer did not establish a written procedure for periodic inspections and testing of high level alarms and high level emergency shutdown systems on process equipment such as, but not limited to: LP Accumulator, Blow Mold Chiller, Control Pressure Receiver, Ice Builder #1, Process Chiller and Suction Accumulator Cooler #3. To abate this violation, the employer shall establish and implement written procedures for installation, replacement and maintenance of flange valves and Pressure Relief Valves. Also, the employer shall establish and implement written procedures for periodic inspections and testing of refrigerating systems following IIAR Bulletin No. 110 and Manufacturers' Instructions. Pursuant to 29 CFR 1903.19(d), the employer must submit documents describing the steps it is taking to ensure compliance, within 30 days of the date it receives this citation. ABATEMENT DOCUMENTATION REQUIRED

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.