Violation Detail
Standard Cited: 19100303 B01 IV General.
Inspection Nr: 1781885.015
Citation: 02004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $906.00
Current Penalty: $500.00
Issuance Date: 10/30/2024
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 11/29/2024
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 11/13/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/13/2024 | $500.00 | 11/29/2024 | Other | |
| Penalty | Z: Issued | 10/30/2024 | $906.00 | 11/12/2024 | Other |
Text For Citation: 02 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(1)(iv): Electric equipment was not free from the recognized hazard of damaged insulation. On or about October 16, 2024, in the transformer area, employees utilized a high voltage cable coming out of the transformer and leading into high voltage circuit box which had outer insulation damage while the cable was being used to supply power to equipment on location.