Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1578747.015
Citation: 02004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/18/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/15/2022
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 08/03/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/03/2022 | $0.00 | 09/15/2022 | Other | |
| Penalty | Z: Issued | 07/18/2022 | $0.00 | 08/11/2022 | Other |
Text For Citation: 02 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Cut Shop - A wooden wedge was placed between the frame and fan cover of a WEG electric motor supplying power to the grinder conveyor, in lieu of being installed and used in accordance with the listing or labeling, on or about February 16, 2022. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate