Violation Detail
Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.
Inspection Nr: 313796732
Citation: 02003B
Citation Type: Willful
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 07/07/2010
Nr Instances: 1
Nr Exposed: 226
Abatement Date: 12/31/2010
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/30/2010 | 12/31/2010 | Willful | ||
| Penalty | Z: Issued | 07/07/2010 | 11/15/2010 | Willful |
Text For Citation: 02 Item/Group: 003B Hazard: CHEMNEP
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment to maintain its mechanical integrity: Facility: Employer did not conduct inspections and tests on pressure vessels, pipes, controls and valves, such as, but not limited to: 1. #9 Low Pressure Receiver 2. #10 Vertical Accumulator 3. #11 High Pressure Receiver 4. #12 Low Pressure Receiver 5. Dump tank 6. Auto purger 7. Ammonia piping including liquid lines, gas lines, thermosyphon suction and return, high stage discharge, relief valve headers 8. Instruments and controls such as level indicators and ammonia vapor detectors 9. Valves such as King valves, check valves, and solenoid valves The inspections and tests should be done according to recognized and generally accepted good engineering practices as stated in Citation 2 Item 3c.