Violation Detail
Standard Cited: 19100037 B05 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1131470.015
Citation: 02003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/02/2016
Nr Instances: 5
Nr Exposed: 90
Abatement Date: 10/21/2016
Gravity: 1
Report ID: 0316700
Contest Date: 09/12/2016
Final Order: 11/08/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | 2: Appeals Court | 11/08/2022 | $0.00 | 10/21/2016 | Serious | |
Penalty | C: Contested | 09/13/2016 | $0.00 | 10/21/2016 | Serious | |
Penalty | Z: Issued | 09/02/2016 | $0.00 | 10/21/2016 | Serious |
Text For Citation: 02 Item/Group: 003B Hazard:
29 CFR 1910.37(b)(5): Each doorway or passage along an exit access that could be mistaken for an exit was not marked "Not an Exit" or similar designation, or be identified by a sign indicating its actual use (e.g. closet): a) Picking Room 2 - On or about March 30, 2016, the door from the Evisceration Room to Picking Room 2 was not labeled 'Not an Exit' or with 'Picking Room 2' when it lead to Picking Room 2. b) Chemical Room - On or about July 6, 2016, the door from the Evisceration Room to the Chemical Room was not labeled 'Not an Exit' or with 'Chemical Room' when it lead to the Chemical Room. c) Break Room - On or about July 6, 2016, the door from the Evisceration Room to the Break Room was not labeled 'Not an Exit' or with 'Break Room' when it lead to the Break Room. d) Process Room - On or about July 6, 2016, the double doors from the Process Room to the Evisceration Room were not labeled 'Not an Exit' or with 'Evisceration Room' when it lead to the Evisceration Room. e) Process Room - On or about July 6, 2016, the door from the Process Room to the Cooler was not labeled 'Not an Exit' or with 'Cooler' when it lead to the Cooler. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.